Thermal Spray System Customization

Thermal Spray System Customization

Your thermal spray system should be designed to meet your requirements for optimized productivity. With our “cradle to grave” approach, more customers have trusted Oerlikon Metco to design their customized thermal spray system than any other company.

Customer Inquiry

Step 1

Your request for a system quotation with a general description of the project. Oerlikon Metco will work with you to get the following input:

  • Part information
  • Coating requirements
  • Productivity input
  • Specific system requirements

Design and Quotation

Step 2

We further discuss the project with your team and survey your site to ensure we have the best possible understanding of your system requirements and boundary conditions.

  • Develop system solution
  • Propose system layout
  • Provide customer quotation
  • Develop deviation list to specification (if applicable)

Order Intake and Manufacturing

Step 3

Once you have accepted our proposal, designated project manager will meet with your team at project kick-off meeting at your site, leading to manufacturing start and system commissioning at Oerlikon Metco site.

  • Overall project time schedule
  • Detailed system layout
  • Customer facility requirements
  • Calibration certificates

System Pre-Acceptance and Shipment

Step 4

We will test your system at Oerlikon Metco in accordance to a mutually agreed pre-acceptance testing protocol. In addition, we provide operation and maintenance training for your staff on your own system at our site. At the end of this step, you will have:

  • Signed pre-acceptance protocol
  • Sprayed samples and/or parts (if applicable)
  • System documentation
    • Training certificates
    • Shipment release

System Installation and Commissioning

Step 5

Your system is installed and commissioned by Oerlikon Metco specialists at your site. We will provide:

  • Installation reports
  • System calibration protocol (if applicable)

Customer Training

Step 6

Once your system is installed, we can further train your staff at your site with specific training for system operation, maintenance and coating application (if applicable). We will provide:

  • Training certificates for each of your staff

Final System Acceptance

Step 7

In this step, you give Oerlikon Metco your final system acceptance, which will include:

  • Signed final acceptance protocol
  • Sprayed samples and/or parts (if applicable)
  • Noise level protocol
  • System warranty start
  • Service contract

After Sales Support

Step 8

Oerlikon Metco is always there for you with customized post-sale support services designed to keep your system operating in peak condition.

  • Coating materials and spare parts
  • Application support
  • Technical support
  • System calibrations
  • Warranty services
    • Emergency system diagnostic and repair services
    • Customized training